These pictures were taken at Pye's factory during construction.
This is the equipment area (zone 1)
Most prominent is the mains distribution panel with the 4 Camera Control Units (CCU) behind. Below are the Sync Pulse Generators (SPG), the Distribution Amplifiers, test signal generators and the audio tape recorder.
This picture and the previous one were taken through the open offside door.